Loading...
Final Control Construction 101422 Final Construction Control Document ;J a To be submitted at completion of construction by a Registered Design Professional for work per the ninth edition of the Massachusetts State Building Code, 780 CMR, Section 107 Project Title: Verizon—West Yarmouth MA(Site ID: 156640—Fuze ID: 16243951)(Permit No.: BLD-21-007432) _ Property Address: 480 Buck Island Road,Yarmouth,MA 02673 Date: 10/14/2022 Project: Check(x)one or both as applicable: ❑ New construction 2 Existing Construction Project description: Alteration of an existing wireless communications facility including modification of water tank mounted RF equipment, mounting hardware and associated feeder line alterations and ground level equipment within an existing fenced compound as shown in the construction drawings prepared by ProTerra Design Group,LLC revised through 06/04/2021, (RevO). I Jesse M. Moreno MA Registration Number: 47315 Expiration date: 06/30/2024,am a registered design profession,!, and I have prepared or directly supervised the preparation of all design plans,computations and specifications concerning': ❑ Entire Project(Site Plan) ❑ Architectural ❑ Structural ❑ Mechanical ❑ Fire Protection ❑ Electrical Other: Telecommunications Alteration for the above named project. I,or my designee,have performed the necessary professional services,in accordance with the Professional Standard of Care,and was present at the construction site on a regular and periodic basis. To the best of my knowledge, information, and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed, for conformance to this code and the design concept,shop drawings,samples and other submittals by the contractor in accordance with the requirements of the construction documents.Such review shall not diminish or relieve the contractor of its submittal and other responsibilities. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code.The contractor is responsible for the performance of the work in accordance with the contract documents and shall be exclusively responsible for its construction means, methods, sequences and procedures, and for construction safety. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. Enter in the space to the right a"wet"or electronic signature and seal: 4,'atS Jesse Digitally signed ,i) JESSE M. G by Jesse Moreno, g ENO Moreno, PE CI IL .o Date:2022.10.14 t _ PE 13:25:31-04'00' ,,,, z... Phone number: (413)320-491 !Q�V`, Email:_imoreno rr proterra-design.com Building Official Use Only Building Official Name: ti`/f Permit No.: Date: Version 01 01 2018